Skip to Content

July 2026

Assembly of the First Houses in Corbera de Llobregat

On Monday, July 16, the assembly of the first 2 houses in Corbera de Llobregat began. Each home consists of a total of 12 modules: 8 living modules, distributed in 4 modules on the ground floor and 4 modules on the first floor, and 4 roof modules.

These first two homes are part of a promotion of 11 houses that will be installed on-site using an industrialized construction system, which allows for the optimization of execution timelines and significantly reduces the work carried out on the site.